Floor jobs are compact but unforgiving — slope errors and membrane shortcuts show up as leaks, not looks. Every Berlin floor follows six steps with hold-points you can inspect: after removal (see the substrate), after waterproofing (see the membrane + flood test), and at handoff (flow test + walkthrough). No step gets buried before you can check it.
- Diagnose. Moisture map, pan assessment, fixed written quote — free.
- Remove. Floor out to a clean wall line; walls, glass protected.
- Rebuild base. Slope verified or re-poured; membrane + clamped drain.
- Flood test. Pan proven watertight before a single tile is set.
- Tile & grout. Full-coverage set, epoxy grout, sealed transitions.
- Flow test & walkthrough. Drain proven, punch-listed, care guide in hand.
The Berlin floor sequence
Floor systems we set across Berlin — grip, slope-fit and grout that lasts.
The workhorse — grippy, cheap, perfect.
Vintage grip, endless joints.
Spa texture, expert grout.
Modern lines that turn slope.
Berlin notes
In Berlin most floors run a day and a half door-to-door: Berlin's most common call: a fiberglass surround gone yellow and chalky around a perfectly good tub — re-tile the walls, keep the tub. Shower again 24 hours after grout — we'll time it to the hour, not the day.
Common questions
For diagnosis and walkthrough yes; workdays are fine with a key — contained area, one crew, locked up after.
Protected in place or removed to padded storage and reinstalled — our responsibility either way, stated in the quote.
Day one: remove, rebuild base, waterproof, flood test. Day two: tile, grout, detail, flow test, walkthrough. Single-day compressions for simple re-tiles.
Removal morning is the loud half-day; the rest is quiet hand work with barriers and daily cleanup. Condos and occupied homes are routine for us.